PT Bhakti Coal Resources, a coal company owned by PT MNC Energy Investments Tbk, controls 8 concessions, namely PT Bhumi Sriwjaya Perdana Coal, PT Putra Muba Coal, PT Indonesia Batu Prima Energi, PT Arthaco Prima Energy, PT Sriwijaya Energi Persada, PT Energi Inti Bara Pratama, PT Titan Prawira Sriwijaya and PT Primaraya Energi. The 8 concessions has a combined area of 72,478 Ha with 1.6 billion MT of coal resources and 253 million MT of mineable coal reserves, operating in Musi Banyuasin, South Sumatera, Indonesia.
Operating since 2013, the recently renewed operating licence on May 20, 2022 is valid for 10 years. A coal concession covering an area of 6,868 ha located in Tungkal Jaya District, Musi Banyuasin regency, 120 km northwest of Palembang.
Producing 563,550 MT of coal in 2021. 427,226 MT in volume were sold in 2021, mostly to fulfill domestic demands. Planning to produce 1.8 million MT of coal in 2022.
Our open-pit mining is conducted by appointing three contractors. Coal is transported 17 km from mine site to company owned jetty port accommodating barges up to 300 feet in Mangsang Village, Bayung Lencir district. A barge sailing distance of 100 km; transhipment is carried out at Tanjung Buyut, Palembang anchorage.
Resources: 155,086,000 MT.
Reserves : 83,275,520 MT.
Operating since 2009, the recently renewed operating licence on January 5, 2018 is valid for 10 years. A coal concession covering an area of 2,947 ha located in Tungkal Jaya District, Musi Banyuasin regency, 120 km northwest of Palembang.
Producing 2,015,155 MT of coal in 2021. 1,924,581 MT in volume were sold in 2021, mostly to fulfill domestic demands. Planning to produce 4.5 million MT of coal per year in the upcoming years.
The domestic destinations include Jakarta, Cilegon, Semarang, Cilacap, Gresik and Medan. Meanwhile, the export destinations are India, China, Thailand, Malaysia, Pakistan and Vietnam.
Our open-pit mining is conducted by appointing two contractors. Coal is transported 10 km through our all-weather hauling road from mine site to company owned jetty port accommodating barges up to 330 feet in Sungai Lilin district, which includes movable screen, weighing bridge, stockyard, barge loading equipment together with other supporting facilities. A barge sailing distance of 100 km transhipment is carried out at Tanjung Buyut, Palembang anchorage.
Resources: 76,900,000 MT. Reserves : 54,822,642 MT
PT Indonesia Batu Prima Energi has been operating since 2013, with an operating license valid for 10 years (initiated on May 30, 2013); which is available for extension. A coal concession covering an area of 15,000 ha located in Sungai Lilin district, Musi Banyuasin regency, 120 km northwest of Palembang.
The Company has initiated coal production in 2022, targeting 500 thousand MT of coal by the end of the year, fulfilling international demands from India, China, Vietnam, and Thailand with a 25% domestic market obligation (DMO).
An open-pit mining, conducted with heavy equipment. Coal will be transported 5 km through our hauling road from mine site to company owned jetty port accommodating barges up to 300 feet in Sungai Lilin district, which includes movable screen, weighing bridge, stockyard, barge loading equipment together with other supporting facilities. A barge sailing distance of 100 km; transhipment is carried out at Tanjung Buyut, Palembang anchorage.
Resources : 560,294,2984 MT
Reserves : 6,220,000 MT
Operating since 2013, with an operating licence valid for 10 years (initiated on May 30, 2013); which is available for extension. A coal concession covering an area of 15,000 ha located in Keluang District, Musi Banyuasin regency, 120 km northwest of Palembang.
The Company plans to initiate coal production in 2022, producing 1 million MT of coal
per year.
An open-pit mining, conducted with heavy equipment. Coal will be transported 12 km through our hauling road from mine site to company owned jetty port accommodating barges up to 300 feet in Sungai Lilin district, which includes movable screen, weighing bridge, stockyard, barge loading equipment together with other supporting facilities. A barge sailing distance of 100 km; transhipment is carried out at Tanjung Buyut, Palembang anchorage.
Resources: 792,229,434 MT
Reserves: 109,100,000 MT
The Company’s concession covers an area of 13,630 ha and is located in Musi Banyuasin regency, South Sumatra. The concession is currently in the development stage prior to the commencement of commercial production.
The Company’s concession covers an area of 4,424 ha and is located in Musi Banyuasin regency, South Sumatra. The concession is currently in the development stage prior to the commencement of commercial production.
The Company’s concession covers an area of 6,015 ha and is located in Musi Banyuasin regency, South Sumatra. The concession is currently in the development stage prior to the commencement of commercial production. PLTU SumBagsel-1 MT 2×150 MW, 2018/2019 Selat Karimata S. Benu S. Buntu Kecil S. Palawan.
The Company’s concession covers an area of 8,596 ha and is located in Musi Banyuasin regency, South Sumatra. The concession is currently in the development stage prior to the commencement of commercial production.